Savitri, N. M. “Conceptual Cost Estimation (CCE) Pada Pembangunan Gedung Kuliah Bersama (Gkb 3) Universitas Negeri Malang (UM)”. Ranah Research : Journal of Multidisciplinary Research and Development, Vol. 7, no. 3, Mar. 2025, pp. 2128-35, doi:10.38035/rrj.v7i3.1354.