Implementasi Manajemen Proyek Pembangunan Radar Cuaca Tipe C-Band dan S-Band

##plugins.themes.academic_pro.article.main##

Maulana Putra

Abstract

The implementation of weather radar development projects requires optimal management to ensure timely completion, budget adherence, and expected quality. This study analyzes the application of project management in the procurement and installation of C-Band and S-Band weather radars in Indonesia. The methods used include project scope identification, detailed task structuring, critical path analysis, and risk mitigation strategies at each project stage. The results show that the key factors influencing project success are structured time planning, human resource coordination, and risk management throughout the process, from procurement to final testing. With effective project management, weather radar projects can be executed more efficiently and contribute to improving Indonesia’s weather monitoring system

##plugins.themes.academic_pro.article.details##

How to Cite
Putra, M. (2025) “Implementasi Manajemen Proyek Pembangunan Radar Cuaca Tipe C-Band dan S-Band ”, Ranah Research : Journal of Multidisciplinary Research and Development, 7(4), pp. 2788-2795. doi: 10.38035/rrj.v7i4.1554.

References

Besevic, M., Vojnic Purcar, M., Kozaric, L., & Bursac, S. (2022). Structural design of the radar station of “Besna Kobila” Serbia. IOP Conference Series: Materials Science and Engineering, 1242(1), 012005. https://doi.org/10.1088/1757-899x/1242/1/012005
Frangakis Cano, Y. (2024). Project management: hybrid approach for construction projects. MOJ Biology and Medicine, 9(2), 42–51. https://doi.org/10.15406/mojbm.2024.09.00216
Haryani, E. (2009). Kajian Manajemen Proyek pada Implementasi System Application and Product-Order to Cash PT. XYZ Semarang. Jurnal Teknologi Informasi-Aiti, 6, 45–59.
Ismail, R., Othmani, M. I., Said, I., & Dan, W. (2023). The Effective Project Management Approach Towards Minimising Environmental Impacts In The Construction Industry. Journal of Technology and Operations Management, 18(2), 60–72. https://doi.org/10.32890/jtom2023.18.2.5
Kaufmann, C., & Kock, A. (2022). Does project management matter? The relationship between project management effort, complexity, and profitability. International Journal of Project Management, 40(6), 624–633. https://doi.org/10.1016/j.ijproman.2022.05.007
Leite, J. P., Lima, L. A. de O., Leão, A. P. da S., Fonseca, M. P., Sebastiani, R. T., Silva, M. M. da, Silva, G. P. G. da, Braga, T. da S., & Silva, L. H. P. da. (2024). Project management and its contributions to the implementation of environmental management systems. In Multidisciplinary Perspectives: Integrating Knowledge. Seven Editora. https://doi.org/10.56238/sevened2024.007-013
Pasaribu, B., Latief, Y., & Riantini, L. S. (2019). Development of Risk-Based Standardized Work Breakdown Structure (WBS) to Improve Quality Planning of Drainage Construction Work. IOP Conference Series: Earth and Environmental Science, 258(1). https://doi.org/10.1088/1755-1315/258/1/012054
Putra, M., Rosid, M. S., & Handoko, D. (2024). Rainfall Estimation Model in Seasonal Zone and Non-Seasonal Zone Regions Using Weather Radar Imagery Based on a Gradient Boosting Algorithm. Atmosphere, 15(6). https://doi.org/10.3390/atmos15060726
Rodhi, N. N., & Sari, A. K. R. (2024). Perencanaan Manajemen Proyek Dalam Meningkatkan Efektifitas Kinerja Sumber Daya Manusia di Bojoneogoro. Dearsip, 4, 25–32.
Rosanti, N., Setiawan, E., & Ayuningtyas, A. (2016). Penggunaan Metode Jalur Kritis Pada Manajemen Proyek (Studi Kasus: PT. Trend Communications International). Januari, 8(1), 23–30.
Widiasanti, I., Musti, A. R., Rabitsani, A. I., Afriani, B., Ardiansyah, M. I., & Seftiani, N. (2023). Pentingnya Implementasi Manajemen Waktu di Dunia Konstruksi. Jurnal Talenta Sipil, 6(2), 236. https://doi.org/10.33087/talentasipil.v6i2.291
Zhang, Z., Xu, Q., Hu, X., Cai, B., Wu, Y., Yang, J., & Zhao, M. (2024). Dual-Frequency, Dual-Mode Reconfigurable Digital Atmospheric Radar Receiver Design. Electronics (Switzerland), 13(10). https://doi.org/10.3390/electronics13101879